Our Latest Blogs
Search for something specific.
![](https://radiangen.com/wp-content/uploads/2023/10/digital-8280786_1920-1024x574.jpg)
Cybersecurity Deployment Process for Renewable Installations – Part 2
Implementation & Construction This is the second post in a three-part series about the cybersecurity deployment process for renewable installations. In the previous post, we discussed the initial design and
![](https://radiangen.com/wp-content/uploads/2023/10/software-development-6523979_1920-1024x683.jpg)
Cybersecurity Deployment Process for Renewable Installations – Part 1
Design & Development The United States Cybersecurity & Infrastructure Security Agency (CISA) identifies 16 critical infrastructure sectors “whose assets, networks, and system, whether virtual or physical, are considered so vital
![](https://radiangen.com/wp-content/uploads/2023/10/digital-8280787_1920-1024x574.jpg)
Effective Cybersecurity Deployment for Renewable Facilities
Innovations in renewable energy have rapidly transformed the global power landscape, but as the power grid becomes more integrated with renewable energy sources, an introspective review of how to deliver
![solar, covered, snow-5903373.jpg](https://radiangen.com/wp-content/uploads/2023/09/solar-covered-snow-5903373-1024x682.jpg)
Winter Weatherization
Be Prepared for Winter: Listen to Our Podcast Episode About It As winter approaches, it’s crucial to prepare your renewable assets for the challenges that colder weather can bring. One
![](https://radiangen.com/wp-content/uploads/2023/08/pexels-mark-stebnicki-11678747-1024x645.png)
Navigating the New NERC Solar GADS Reporting Requirement
Understanding the New Solar NERC GADS Reporting Requirement The North American Electric Reliability Corporation (NERC) has long been a steward of the power industry, fostering reliability and security across the
![](https://radiangen.com/wp-content/uploads/2023/07/165512844-1024x683.jpg)
Upcoming NERC Threshold Changes – Part Three of Three
How NERC’s Threshold Change Will Affect Critical Infrastructure Protection The inverter-based resources (IBRs) that are now subject to NERC registration, meaning those connected to the bulk power system with an
![](https://radiangen.com/wp-content/uploads/2023/06/138306842-1024x683.jpg)
Upcoming NERC Threshold Changes – Part Two
3 Things to Know About NERC’s “Work Plan” The Federal Energy Regulatory Commission (FERC) issued an order on May 18, 2023, titled “Order Approving Registration Work Plan.” This new order
![This is a photo of a large group of solar panels.](https://radiangen.com/wp-content/uploads/2023/06/pexels-quang-nguyen-vinh-6876535-1024x683.jpg)
Upcoming NERC Threshold Changes – Part One
What you Need to Know In May of this year (2023), the Federal Energy Regulatory Commission (FERC) issued new guidelines for Inverter Based Resources which are meant to protect and
![](https://radiangen.com/wp-content/uploads/2023/06/pexels-karol-d-841228-1024x683.jpg)
Improving assets with IT Asset Management & Inventory Control
The Need Renewable energy organizations need to manage their assets and inventory effectively to achieve availability goals, increase cyber security, reduce risk, comply with industry standards and control costs all
![](https://radiangen.com/wp-content/uploads/2023/06/pexels-tom-fisk-9893729-4-480x320-1.png)
Summer Weatherization – Understanding PUCT Rule 25.55
While summertime evokes visions of barbeques, sunscreen and vacations, it is also a time when generation entities and transmission service providers face extreme hot weather conditions. During these periods of
![](https://radiangen.com/wp-content/uploads/2023/05/light-bulbs-g10e849759_1280-1024x576.jpg)
The Power of Automating Land Control Activities
Revolutionizing Renewable Energy The renewable energy industry is constantly evolving, with companies continually seeking innovative ways to streamline their operations and maximize output. By automating land control activities, businesses can increase efficiency, enhance accuracy and compliance,
![](https://radiangen.com/wp-content/uploads/2023/04/EOP011BG-1024x489.png)
What is EOP-011-2 Reliability Standard and What You Need to Know
What it is? On April 1, 2023, the North American Electric Reliability Corporation (NERC) implemented new cold weather requirements focused on Generator Owners. What is notable is the requirements provide